Renewable Energy

Curlew Cottage Hydro

Type: Cross flow turbine

Location: Invergarry, Highlands

Details: 32KW / 30m head /

Client: private

Works undertaken:

  • Access to intake 
  • Temporary works and intake installation  
  • Install and weld 250m x 450mm HDPE penstock 
  • 500m of underground cable 
  • Hand dig foundations and construct turbine house 
  • Full reinstatement  
  • Mechanical installation

It is estimated that the hydro scheme will generate 149,000KWh/year, enough to power an average of 34 UK homes. From an environmental perspective, the scheme will also generate a saving of 81,000kg CO2/year.

Peter carried out all the civil engineering for the building of our hydro scheme. We found him to be very hard-working, conscientious and genuinely interested in the work he was doing. He is forward thinking and very meticulous, particular and keen to do a job he is proud of. He certainly did for us. He is knowledgeable and has a wide range of skills and qualifications. His quotations and estimates were accurate. We are more than happy to recommend him. 

Mr Legg

Allt na Fearna Hydro

Type: Turgo turbine

Location: Fort Augustus, Highlands

Details: 100KW / 174m head / 115l/s flow

Client: private client on forestry & land Scotland Estate

Works undertaken:

  • Temporary works and intake installation
  • 850m x 400mm of penstock installation including through one tunnel and one pipe bridge
  • 2.5KM of underground cable
  • Construction of turbine house
    • 2m deep sump
    • Screened outfall chamber
    • Blockwork walls
    • Lifting beam
    • Full cladding using local Scottish larch
  • Full reinstatement
  • 150m HV cable, new overhead poles for DNO
  • Mechanical installation

It is estimated that the hydro scheme will generate 412,000/year, enough to power an average of 107 UK homes. From an environmental perspective, the scheme will also generate a saving of 144,842kg CO2/year.

Allt Choire a’ Bhainidh Hydro

Type: Crossflow turbine

Location: Strathcarron, Highlands

Details: 100KW / 70m head / 225l/s flow

Client: private client on forestry & land Scotland Estate

Works undertaken:

  • New forestry track installation
  • 500m buried great cable installation
  • Installation of metering cabinet
  • Temporary works and intake installation
  • 1450m x 500mm penstock (Molecor PVC-O pipe) including a floated pipe bridge
  • Turbine house construction
    • 5m deep sump
    • Cast concrete walls
    • Lifting beam
    • Full cladding using local Scottish larch
  • Full reinstatement
  • Mechanical installation

It is estimated that the hydro scheme will generate 457,000/year, enough to power an average of 104 UK homes. From an environmental perspective, the scheme will also generate a saving of 292,000kg CO2/year.

Pete has built three hydro schemes for me over five years and done an outstanding job, often in challenging conditions. He maintains very high standards which helps a lot in getting things done right and in managing important stakeholders. He is certainly someone I trust. 

Rich

Allt Eilidh Hydro

Type: Pelton turbine

Location: Creagan, Highlands

Details: 700KW / 130m head / 650l/s flow

Client: private client on forestry & land Scotland Estate

Works undertaken:

  • 1.2Km access track for harvesting works
  • Felling and harvesting 9 hectares of forestry tree crop
  • Quarrying 14,500 tons of hard rock for turbine house
  • Temporary works and intake installation
  • 100m x 900 leat pipe
  • 1350m x 710mm penstock, welded HDPE and ductile iron
  • Reinforced concrete, 88,000 litre forebay/header tank
  • Turbine house construction
    • Submerged circular concrete sump
    • Underground valve chamber
    • Floor slab
    • Steel frame erection
    • Cast concrete walls
    • Lifting beam and gantry crane
    • Roof and 4m roller door
    • Full cladding using local Scottish larch
  • 7.5Km of underground laid cable, 4Km of overhead line upgrade
  • Full reinstatement
  • Mechanical installation

It is estimated that the hydro scheme will generate 2,300,000/year, enough to power an average of 700 UK homes. From an environmental perspective, the scheme will also generate a saving of 610,000kg CO2/year.

Elleric Ground Source Heat Pump

Type: Steible Eltron ground heat source pump

Location: Elleric, Highlands

Details: 13KW / 600m of collector pipework & 50m header pipe

Client: private

Works undertaken:

  • Strip and excavate trench for pipework
  • 3 x 200m of 40mm collector pipe work
  • 50m of 63mm header pipework
  • Line trench with sand
  • Lay pipework and manifold tank
  • Screen material and backfill pipework
  • Full reinstatement with native grass seed